資料介紹:
Provide a fence or enclosure during operation to prevent contact of the operator and
robot.
Installation of safety fence
Establish a set signaling method to the related operators for starting work, and follow
this method.
Signaling of operation start
As a principle turn the power OFF during maintenance work. Place a sign indicating that
maintenance work is in progress on the start switch, etc.
Indication of maintenance work in progress
Before starting work, inspect the robot, emergency stop switch and other related
devices, etc., and confirm that there are no errors.
Inspection before starting work
WARNING
CAUTION
CAUTION
CAUTION