国产免费啪视频观看网站-国产免费区-国产免费全部免费观看-国产免费人成在线视频视频-国产免费爽爽视频免费可以看

廣州菱控|三菱
當前位置:首頁 >> 資料下載 >> 三菱 >> 伺服系統 >> 三菱 M700V 三菱 M700V M70V系列 PLC接口說明書
三菱 M700V 三菱 M700V M70V系列 PLC接口說明書
所屬類別:三菱 >> 伺服系統
資料介紹:

1. Items related to product and manual
For items described as "Restrictions" or "Usable State" in this manual, the instruction manual issued by
the machine tool builder takes precedence over this manual.
Items not described in this manual must be interpreted as "not possible".
This manual is written on the assumption that all optional functions are added. Confirm the specifications
issued by the machine tool builder before use.
Some screens and functions may differ or may not be usable depending on the NC system version.
2. Items related to connection
When using an inductive load such as relays, always contact a diode in parallel to the load as a noise
measure.
When using a capacitive load such as a lamp, always connect a protective resistor serially to the load to
suppress rush currents.
Since the analog output R registers are allocated in ascending order of channels and station numbers, the
analog output destination may change depending on added option.
3. Items related to design
Always turn the spindle phase synchronization completion signal ON before chucking both ends of the
workpiece to the basic spindle and synchronous spindle. If the spindle phase synchronization signal is
turned ON when both ends of the workpiece are chucked to the basic spindle and synchronous spindle, the
chuck or workpiece could be damaged by the torsion that occurs during phase alignment.
CAUTION
三菱 M700V 三菱 M700V M70V系列 PLC接口說明書     三菱 M700V 三菱 M700V M70V系列 PLC接口說明書
相關下載